Frequently Asked Questions (FAQ)

If you are unable to find the answer to your question here, click here to contact an OCM representative who will respond to your question.

 


 

General Information

What is your mailing address? 

Office of Coastal Management, P.O. Box 44487, Baton Rouge, Louisiana 70804-4487

What is your physical address (for UPS, FedEx delivery)?

Office of Coastal Management
617 North 3rd Street, Suite 1078
Baton Rouge, Louisiana 70802

Where is your office located?

Our offices are located on the 10th floor of the LaSalle Building which is on the northwest corner of the North Street and 3rd Street intersection. From Interstate 10 east or west: Follow I-110 when you get to the I-10/I-110 split. Take the North Street exit 1D (exit on the left) then go straight for approximately 6 blocks.

A map and driving directions are also available on our website.

I have a question or a problem, how can I contact the office?

Please refer to the Office of Coastal Management Contacts page to obtain contact information related to permitting, mitigation, interagency affairs, consistency, local programs, non-point source, or enforcement.

What are your business hours?

Our core business hours are 8:00 am - 4:30 pm Monday through Friday.

If you wish to visit with a specific individual please call ahead and schedule an appointment with that person.

What is your fax number?

(225) 342-6760

How can I get a copy of the Coastal Zone map?

You can send your request for a Coastal Zone map to our office at the address/fax number listed above or via e-mail to ocminfo@la.gov

What is the Coastal Zone Boundary?

Louisiana's Coastal Zone boundary delineates the area regulated by the Department of Energy and Natural Resources' Office of Coastal Management (OCM) under Louisiana's federally approved coastal zone management program. Louisiana's original Coastal Zone boundary was established by state law in 1978, and was modified by the Louisiana legislature in 1978 and 1980. The inland boundary of Louisiana's Coastal Zone was further modified June 7, 2012, by Act 588 of the legislature. That boundary change was based on the recommendations of a science-based study requested in 2009 by Louisiana Senate Concurrent Resolution 60. As directed by Louisiana's Coastal Protection and Restoration Authority, OCM completed that study with help from private contractors and the LSU Sea Grant Law and Policy Program and input from numerous stakeholders. The study utilized Information on storm surge, geology, elevation, soils, vegetation, predicted subsidence/sea level rise and boundaries of existing coastal programs to identify areas of high coastal influence. The boundary changes required by Act 588 added a net 1,887 square miles to Louisiana's Coastal Zone, an increase of 12.6%.

You can also view the Louisiana Coastal Zone boundary and related information at the following location: http://dnr.louisiana.gov/index.cfm?md=pagebuilder&tmp=home&pid=928.

What is the Conservation Plan Boundary and why does it differ from the Coastal Zone Boundary?

The Conservation Plan Boundary delineates the area in which the State has agreed to ensure that there is no net-loss of vegetated wetlands caused by development projects. This assurance makes the state eligible for a 10% reduction in its cost-share for major coastal restoration projects. It does NOT increase the regulatory jurisdiction of the Coastal Zone Management Program. It differs from the Coastal Zone Boundary in that it is based on an ecological determination of the extent of tidally influenced wetlands.

How can I get a copy of the rules and regulations?

You can access the most up-to-date rules and regulations on the internet by visiting here:
http://www.doa.la.gov/Pages/osr/lac/LAC-43.aspx 

OR
For more information on the Louisiana Administrative Code (LAC), or for printed copies, please contact:

Division of Administration
Office of the State Register
P.O. Box 94095
Baton Rouge, LA 70804-9095
Telephone: (225) 342-5015

What gives the agency the right to regulate private property?

We are not regulating private property. We regulate activities that have a direct and significant impact on state public resources. Our authority derives from Louisiana Revised Statute 49:214.21 et seq.  

BACK TO TOP

 

Coastal Use Permitting

How can I make a comment on a public notice?

All comments must be in writing and submitted to Office of Coastal Management - Permits & Mitigation Division at the addresses/fax number listed above. Comments also can be posted to the record online by using the "Make Comments" link in the application record. To access the application record, search the P# in the coastal use permitting database, and then click the "online" link on the results screen. Note that, to ensure your comments are received by the appropriate analyst, and can be made a part of the record, be sure to include:

Ø The Coastal Use Permit number (P#),
Ø The Applicant's name
Ø The OCM Permit Analyst's name
Ø The Commenter's name and contact information.

Please note that comments not containing commenter name and contact information (phone number, email address and/or complete mailing address) will be disregarded.

Can I make copies of permit files?

Yes - OCM permit files are public records and they are available for self-serve inspection and copying via the SONRIS system from the comfort of your own desktop. Also, OCM has staff that can help new users learn just how easy remote self-serve access to OCM records in SONRIS is. And while remote electronic self-serve access is the easiest way to access our records, you may still come to our office if you prefer. Please call (225) 342-7591 during business hours, to arrange for visits to review our records, or if you need assistance with remote self-serve records Yes - OCM permit files are public records and they are available for self-serve inspection and copying via the SONRIS system from the comfort of your own desktop. Also, OCM has staff that can help new users learn just how easy it is to access OCM records in SONRIS using remote self-serve. And while remote electronic self-serve access is the easiest way to access our records, you may still come to our office if you prefer. Please call (225) 342-7591 during business hours, to arrange for visits to review our records, or if you need assistance with remote self-serve records access, our office can provide paper copies of a Public Records for a fee. Requests of this sort must go to the DENR Custodian of Public Records.

To request copies to be prepared of public records, please send written letter of inquiry to:

Custodian of Public Records
La. Dept. of Energy and Natural Resources, Legal Division
Attention: James Devitt, Custodian of Public Records
P.O. Box 94396, Baton Rouge, La. 70804-9396.

What are uses of “state” concern?

Uses of “state” concern are those regulated activities that have been specifically designated as being appropriate for permitting at the state level as opposed to being regulated by approved local programs. Examples include activities using state or federal funds, being conducted on state waterbottoms or other state property, oil and gas projects, etc.

What are fastlands?

Fastlands are lands surrounded by publicly-owned, maintained, or otherwise validly existing levees or natural formations as of January 1, 1979, or as may be lawfully constructed in the future, which levees or natural formations would naturally prevent activities, not to include the pumping of water for drainage purposes, within the surrounded area from having direct and significant impacts on coastal waters. It is important to note that the lands are not exempt, but activities occurring within levees that do not have a direct or significant impact are exempt. (LAC, Title 43, Part I, Chapter 7, § 700).

How does the permit process work?

In general, an application is submitted which details the location and scope of the proposed work. Office of Coastal Management – Permits & Mitigation Division, which serves as a central collection point for the applications, distributes the applications to interested parties for their review and comment. Office of Coastal Management - Permits & Mitigation Division and the commenting agencies review the application for conformance with programmatic requirements and look for ways of minimizing impacts to coastal resources (e.g., vegetated wetlands, bird rookeries, endangered species, etc.). If necessary, negotiations are entered into to find locations, technologies or methods of implementing the project which will accommodate the needs of the permit applicant while conforming with the mandates of the various state and federal agencies to reduce adverse impacts to coastal resources. Once consensus is reached an appropriately conditioned permit is issued.

For additional information contact Office of Coastal Management at 1-800-267-4019 or visit the website at: http://dnr.louisiana.gov/coastal/.  You may also contact the U.S. Army Corps of Engineers at 504-862-2255 or visit the website at http://www.mvn.usace.army.mil/Missions/Regulatory.aspx

How long does it take to obtain a permit?

How long it takes to obtain a permit from the Office of Coastal Management depends on several things, the type of activity, the location of the activity, and the applicant. The following schedules are offered with the assumption that all of the information required by Office of Coastal Management is included in the application and the plats are adequate, clear and legible. For activities that are exempt from permit requirements, the determination is normally issued in under seven days. Projects that are determined to have no direct or significant impacts to coastal resources are issued in 4 to 10 days depending on location. Authorizations for activities that qualify for a General Permit are issued in 10 to 15 days. For those activities that require full public notice, a minimum of 45 days is required. During review of the permit application, for more complex activities, additional information may be requested. The more promptly the applicant can furnish this information the less time it will require to issue the authorization. The requirement for mitigation of wetland impacts is one of the factors that increases the time required for permit application review, as does coordination with other State agencies for activities affecting resources of concern to that agency.

Do I need a permit to . . . .?

In general, if the proposed activity is in the Coastal Zone the safest course of action is to submit an application to Office of Coastal Management - Permits & Mitigation Division for formal review. Even when a proposed activity is not in the Coastal Zone, if it might affect coastal resources, a Consistency determination may be required.

We, and representatives of other state and federal agencies involved in the permit process, are available for pre-application meetings which can provide substantive guidance on what will be required and ways to ease the permit process.  We encourage potential applicants to contact us to arrange a pre-application meeting to expedite the permit process.

Why can’t I fill in all my property?

Both the state and federal laws governing wetland development require that wetlands be conserved to the maximum extent practicable. If you can demonstrate that there is a reasonable need for the use you propose, that there are no other non-wetland or less damaging sites available, and that the entire property is required to fulfill the use, you may be allowed to fill the property in its entirety; however, appropriate mitigation may be required.

If my proposed activity is not in the Coastal Zone, do I still need to send an application to the Office of Coastal Management?

That depends, if you need a formal determination from our agency that the activity is outside of our regulatory jurisdiction (on occasion some other regulatory entity will require a written determination from our office) you will have to submit an application for that written determination.  Additionally, you do need to submit an application if the proposed activity is outside the Coastal Zone, but still may have an impact on coastal lands, water, or resources. Review of the activity will occur through the Consistency process rather than the permit process.

Can I find out if I need a permit without filing an application?

Yes, you can either submit a “Solicitation of Views” (SOV) or a “Request for Determination” (RFD) without having to file a complete application.

If you submit a SOV, you will receive a determination of whether or not your application is situated within the Coastal Zone. SOVs require only the barest of information - perhaps only the project location but also details of what the project entails. We need enough information to determine location and whether the project will have direct and significant impacts to coastal waters. Application fees are waived for SOVs.

If you submit a RFD, you will get a determination of whether or not a permit is required. RFDs require the submittal of a nearly complete application packet, though nonessential information (landowner notification affidavit, adjacent landowner list, etc.) can be omitted. In your application for RFD, please state the reason you believe your project is exempt from permitting.  If a permit is required, your application will be changed to a request for permit. Application fees are not waived for RFDs.

If you are interested in buying a property and are concerned about utilizing it as you wish, some people have found it useful to get a wetland delineation of the property and include a clause in their purchase agreements which allows them to cancel the purchase in the event appropriate permits cannot be obtained in a reasonable amount of time

What is "Site Clearance"?

The term "Site Clearance" is often used to refer to the activities carried out for Site Clearance Verification which is the trawling or side scan sonar activities to locate and remove any objects and obstructions remaining after exploration and/or production, and to verify that the site is clear of such items. More accurately, the term also refers to the work to plug and abandon a well, remove the pilings, structures and pipelines, and occurs prior to Site Clearance Verification. Applicants should be clear as to the terminology since "Site Clearance Verification" does not require a coastal use permit, however "Site Clearance" may require a Coastal Use Permit (CUP). See the next FAQ for guidance as to criteria requiring a CUP application.

Do I need a CUP for Well Plug and Abandon and/or Site Clearance activities?

The actions needed to plug and abandon a well, remove the pilings, structures and pipelines, occur prior to Site Clearance Verification and may require a Coastal Use Permit (CUP). Any dredging necessary for access to the site, including propwashing, requires a CUP application. Any excavation to expose existing flowlines for cutting, capping and abandoning in place or for the removal of any existing structures requires a CUP application. Projects near environmentally or administratively sensitive features must be reviewed and approved by the responsible oversight agency prior to issuance of an authorization to ensure there will be no adverse impacts to such resources. Environmentally and administratively sensitive features include: oyster seed grounds, wildlife management areas, state wetlands restoration projects, Master Plan features, oyster leases, bird rookeries, etc.; or if the project is located within one-quarter mile of a barrier island; located on a chenier, barrier beach, dune, salt dome or similar isolated, raised landform; or there are any impacts to vegetated wetlands (emergent or submergent). An applicant may obtain this approval by contacting each of the appropriate agencies, but the most efficient method to obtain this determination is to submit a CUP application. In many cases plug and abandonment and site clearance activities are determined to be "NDSI" (i.e. have no direct and significant impact on coastal resources), however, an application is necessary to verify whether an NDSI determination is appropriate. If there is no dredging, propwashing, or excavation and no environmentally or administratively sensitive features are impacted, plug and abandon and site clearance activities do not require a CUP application. If pipelines are associated with the well, and were installed after August of 1980 under CUP authorization, the lines are required to be removed, which would require a CUP for such removal. Failure to remove pipelines as required by an Office of Coastal Management authorization is a violation of the State's Coastal Program. Trawling for debris or running side scan sonar during Site Clearance Verification, as required by the LA DENR Office of Conservation, does not require a CUP

What are the permitting requirements for workover and other well maintenance activities?

Well maintenance activities, including workover activities, do not, in and of themselves, require a Coastal Use Permit (CUP), however, any excavation required for access or operations would require a CUP. Additionally, if pilings, shell pads, platforms or other structures are required, those activities require a CUP. Projects near environmentally or administratively sensitive features must be reviewed and approved by the responsible oversight agency prior to issuance of an authorization to ensure there will be no adverse impacts to such resources. Environmentally and administratively sensitive features include: oyster seed grounds, wildlife management areas, state wetlands restoration projects, Master Plan features, oyster leases, bird rookeries, etc.; or if the project is located within one-quarter mile of a barrier island; located on a chenier, barrier beach, dune, salt dome or similar isolated, raised landform; or there are any impacts to vegetated wetlands (emergent or submergent). An applicant may obtain this approval by contacting each of the appropriate agencies, but the most efficient method to obtain this determination is to submit a CUP application. In many cases these are determined to be "NDSI", but a CUP application is necessary to verify this is the case. Please note that if sidetracking an existing well and a new well serial number is required, a new CUP application is necessary prior to applying for the Office of Conservation drilling permit for the new well serial number. For those situations where a drill barge is on an existing location and the side track drilling does not require a new well serial number, then no additional CUP application permit will be required from Office of Coastal Management provided the activities associated with sidetrack drilling do not include additional excavation for access, propwashing, shell pad, or installation of pilings and/or platforms.

I have a mineral lease from the State. Do I need a permit to maintenance dredge a canal?

Yes, all dredge and fill activities in the Coastal Zone require an application for coastal use permit.

Do I need a permit for maintenance activities of my pipeline?

Maintenance activities for pipelines that do not involve impacts to the surface of the ground such as aerial inspections and running smart pigs do not require a permit.  Running smart pigs typically does not require authorization from OCM if the pig will be run from one platform to another; however, any excavations to perform maintenance activities or inspections, lowerings or repairs likely will require an OCM authorization. Clearing the rights-of-way (R-O-Ws) of brush and trees also may require a permit.  If the R-O-W is functioning as a vegetated wetland habitat type and that habitat will be changed or degraded, mitigation may be required.  If the R-O-W is just overgrown and has been maintained, typically a permit is not required; however, tracking of equipment is a concern and may require permitting in some situations.  Any access route that does not include the existing R-O-W will require additional permitting.  If you have questions regarding the necessity for a permit for pipeline maintenance activities please contact the Office of Coastal Management, Permits/Mitigation Division.

What types of permits are there?

Office of Coastal Management issues three types of authorizations:

Some types of coastal activities are exempt from Coastal Use Permits yet still must be consistent with the Louisiana Coastal Resources Program. These activities are reviewed by the Consistency Section of the Office of Coastal Management – Interagency Affairs, Field Services, & Compliance Division.

Is an application required for a General Permit?

Yes, it is necessary to submit a complete application packet to obtain a GP authorization. Copies of the current General Permits are available on the internet. Click here to view the current General Permits.

How do I find out which type of permit I need for an activity?

Office of Coastal Management - Permits & Mitigation Division will determine the type of permit required based on the information you submit to us - don’t worry about trying to make the determination yourself.

Can I submit a permit application to the parish instead of the state?

Yes, if your project is located in a parish with an approved Local Coastal Program (Calcasieu, Cameron, Jefferson, Lafourche, Orleans, Plaquemines, St. Bernard, St. James, St. Tammany or Terrebonne) then you may submit your application to either the approved local program or the state office. If you submit the application to the state office, it will be input into the system and reviewed at that time. If you submit your application to the local parish office, then that office will forward the application to the state office to be input into the system and reviewed. Please allow additional time to receive a response if you choose the latter option.

BACK TO TOP

 

CUP Application

How do I get to the application packet on your website?

The application form, instructions and checklist are available for download here.

Can we meet/can you come down and help me fill out the application?

Yes. Someone from our office will be happy to meet with you either at our main office or one of our field offices to assist you with the application. Office of Coastal Management - Permits & Mitigation Division personnel CANNOT fill out the application for you or draw or revise your plats. We can, however, discuss with you the information that needs to be provided. If you are in a parish with an approved local program, their staff members are also available to help you.

How many copies of the application do I need to send in?

If you submit a paper application via mail, fax, or hand delivery, then you must submit at least one hard copy. However, no hard copies are necessary if you use the electronic system to submit your application. Click here to view the online application and to access the paper application http://workflow.dnr.state.la.us/sundown/cart_prod/pkg_dnr_wf.initiate.

What do I need to send in with my application for it to be complete?

The application checklist found on the internet here.

This site provides you with a comprehensive list of the basic information/materials required to get the permit review process started. Submittal information includes but is not limited to: an application-fee check, a completed application form, a vicinity map, a detailed plan view, a detailed cross-section view and a landowner notification affidavit will get you started. Additional information, such as a justification and needs assessment, alternatives analysis, mitigation proposal, etc., may be required during processing depending on the specific nature and location of your project.

Who gets the copies of the application?

The application is distributed to the following governing bodies:

  • Office of Coastal Management - Permits & Mitigation Division,
  • Local Programs Section if the project is in a parish with an approved Local Program (to expedite coordination with the parish’s Local Program, which will also get a copy),
  • The local parish government where the project is located,
  • Office of Coastal Management Support Services staff,
  • the appropriate Office of Coastal Management Field Investigator (to see if a field investigation is likely to be required),
  • U.S. Army Corps of Engineers,
  • State Land Office.

How does the Office of Coastal Management protect the information that I provide throughout my Joint Permit Application?

Information provided on the application is used to evaluate the activity that is proposed for permitting, and this information is generally available for inspection and copying by the public, pursuant to the Louisiana Public Records act. There are some limited exceptions to the public records laws to protect certain types of records or information from public inspection. Please contact our office, before you submit any records or information that you would prefer not be available for public inspection or copying. In any case, simply marking a document “CBI” or “confidential business information” will not guarantee that the records or information will be protected from public inspection and copying.

If I don’t know who the adjacent property owners are, what do I do?

In many cases your local parish officials should be able to help you by going over tax rolls, utility bill records, etc. It may be necessary to visit with the Clerk of Court to go over property transfer records.

How do I figure cubic yardage/ acreage, etc.?

To calculate cubic yards: multiply the length by the width by the depth (in feet) of the area to be dredged or filled and divide by 27.

To calculate acreage: multiply the length by the width (in feet) of the site and divide by 43,560.

What do you mean by the statement "I need to show the mean low and high water levels on my plats?" How can I acquire this information?

Water depths are needed in our evaluation of whether dredging, propwashing, etc. might be needed to access a location. Mean low and mean high water levels help us in that determination. Additionally, this information is critical for activities located along shorelines to determine whether state waterbottoms will be impacted by the project.

For smaller, non-commercial projects - bulkheads, piers, etc. - the applicant is generally familiar enough with the property to give a pretty good indication of where the “average” low and high water lines are without needing outside help - we don’t need scientific accuracy just a good indication based on their experiences. For larger projects, commercial activities or when the applicant does not have a good idea of local conditions the U.S. Army Corps of Engineers can provide tidal data from the closest water level monitoring gauge.

Do I need a surveyed plat of the property?

In most cases surveyed plats are not required; however, the plats that are submitted need to be clear, legible, and reproducible. The plats also need to accurately represent the current conditions of the site and what is proposed. We also require the latitude and longitude and the section, township and range of the proposed activity. Both are required for commercial activities, either is acceptable for noncommercial activities.

What is a plan-view/cross-section view drawing?

A “plan view” shows the layout of the proposed project from an overhead perspective - like you’re looking down on it from an airplane.

A “cross-section view” shows how the project looks from the side- including dimensions.

Click here to view some sample plats for some typical activities.

 

What is this landowner notification affidavit?

The landowner notification affidavit is a legislatively mandated statement (R.S. 49:214.30.C.2.a.) that you have sent a copy of the application packet to the landowner(s) of the property on which the project is located.  By law, the landowner must be notified of the application.

Does the landowner notification affidavit need to be notarized?

No.

Can my agent sign the landowner notification affidavit for me?

Yes.

I have a surface lease for this property, why do I need to notify the landowner of the proposed activity?

The state law that mandates submittal of a landowner notification affidavit (R.S. 49:214.30.C.2.a.) contains no provision to exempt lease holders from the law.

If I own the property, do I still need to submit a landowner notification affidavit?

Yes.

How do I find out who the landowners are and then contact them?

In many cases your local parish officials should be able to help you by going over tax roles, utility bill records, etc. It may be necessary to visit with the Clerk of Court to go over property transfer records.

What are the fees for permit application and processing?

Permit Type

Permit Application Fee

Permit Processing Fee

Minimum Permit Processing Fee

Maximum Permit Processing Fee

Residential

$20.00

$0.04/cubic yard

No processing fee is assessed if there is less than 125 cubic yards of material dredged or filled.

$2,000.00

Non-Residential

$100.00

$0.05/cubic yard

A minimum permit processing fee of $25 is assessed if the use involves dredging and/or filling of less than 500 cubic yards of material.

$5,000.00

  • Note that government sponsored drainage improvement projects are not assessed permit application or permit processing fees

 

How do I know what is going on with my application?

You can track all activity related to your application in the Coastal Use Permit Application Database. Click here to search the database.

When I receive my permit from Office of Coastal Management, may I begin work?

Following receipt of the determination from Office of Coastal Management, work may begin only after obtaining any necessary permit(s) from the U.S. Army Corps of Engineers, including any required mitigation, and any approvals or permits required by any local authority or agency or by any state or federal agency, as may be required by law for said activity or the construction of the referenced project. (See Coordination with Other Agencies)

BACK TO TOP

 

Other Regulatory Agencies and Agency Coordination

In addition to the permit issued by Office of Coastal Management - Permits & Mitigation Division, will I need to get a permit from the U.S. Army Corps of Engineers?

Yes, in most cases you will need approval from the U.S. Army Corps of Engineers - the specific type will vary depending on your project.

In addition to the permit issued by Office of Coastal Management - Permits & Mitigation Division, what other permits may be required?

If your project involves dredging or filling of wetlands you may need a Water Quality Certification from the Department of Environmental Quality (call Elizabeth Johnson at 225/219-3526).

How can I find out the requirements to obtain a U.S. Army Corps of Engineers (USACE) permit?

To find out the requirements to obtain USACE permit click here: http://www.mvn.usace.army.mil/Missions/Regulatory.aspx

What is Section 10 of the Rivers and Harbor Act?

Section 10 of the Rivers and Harbor Act of 1889 prohibits the obstruction or alteration of navigable water of the United States without a permit from the U.S. Army Corps of Engineers.

What is Section 404 of the Clean Water Act?

Section 404 of the Clean Water Act prohibits the discharge of dredged or fill material into waters of the United States without a permit from the U.S. Army Corps of Engineers.

Has Louisiana assumed 404 responsibilities from the U.S. Army Corps of Engineers?

No. While the State Coastal Use Permit and Federal 404/10 permit processes are similar, they were established under different federal laws.  The State of Louisiana has considered assuming 404, but after a thorough review of the program, declined to assume those responsibilities.

What does the Coast Guard require for marking/lighting of structures?

As these requirements are subject to change, please contact your local Coast Guard station to obtain the most current information. To find out more information visit the website at http://www.uscg.mil/

If my project is in a fastlands area, why do I need a U.S. Army Corps of Engineers permit but I do not need a permit from the Office of Coastal Management?

The Louisiana legislature exempts activities occuring in fastlands from permitting by the Office of Coastal Management unless the Secretary determines that the specific activity will have a “direct and significant impact on coastal waters”.

The U.S. Army Corps of Engineers regulatory program is based on a different, federal law which does not contain that exemption.

What is a PGP and how does it work?

The PGP (Programmatic General Permit) is a type of general permit used by the Corps of Engineers. From the COE web site "A programmatic general permit is one founded on an existing state, local or other Federal agency program and designed to avoid duplication with that program". The New Orleans District has established a PGP in conjunction with the Office of Coastal Management (OCM) Coastal Use Permitting program. The PGP applies to small to medium sized projects with limited impacts to wetlands. Essentially it allows the COE to issue a letter to the applicant stating that the permit and its conditions obtained from the OCM will also serve as authorization from the COE. This allows a much faster review by the COE staff. With the PGP in effect, it replaces all COE District and Nationwide general permits for those activities not exempt from the OCM permitting program.

Other approvals may be required from the State Land Office, the Department of Culture, Recreation and Tourism, the Department of Transportation and Development, the Department of Health and Hospitals and/or the Department of Wildlife and Fisheries, but those agencies will notify you of their requirements as part of the Joint Public Notice process.

It is advisable to check independently with local city/parish agencies to see if building permits or other local authorizations might be required.

If I send the application for a “Class A” permit to Office of Coastal Management - Permits & Mitigation Division will you forward it to State Lands?

The Office of Coastal Management does not process applications for “Class A” permits. This correspondence should be directed to

Louisiana State Land Office
P. O. Box 44124
Baton Rouge, Louisiana 70804-4124

Do I need to take the application to DEQ myself?

No, Office of Coastal Management - Permits & Mitigation Division will forward a copy of your application to DEQ at their request (they have asked us not to forward copies of all applications to them).

BACK TO TOP

 

Permit Term, Extensions, and Transfers

How long is my permit valid?

Permits are typically valid for five years; however, the initiation period expires two years from the date the permit was issued. Please see Permit Time Limits questions 2, 3, and 4 for more information about the initiation period and extensions.

Please explain the two-year initiation period.

In most cases (there are some exceptions) you must commence work on your project within 2 years of the date of permit issuance.

Can I get an extension for the initiation period for a permit after the two (2) year deadline?

The initiation period can be extended for an additional 2 years if you submit a written request to us no less than 60 and no more than 180 days before the initial 2 year period expires. Requests received later than 60 days prior to the expiration date of the permit shall be eligible for consideration for extension, however a permittee who fails to make a timely request for an extension shall not engage in any activity requiring a coastal use permit past the original permit expiration date until an extension of the lapsed permit or a new permit is granted.

Can I get an extension of the five (5) year term to complete the permitted activities?

Yes. The term to complete the use may be extended for up to a total of an additional three (3) years beyond the term for completion from the date of permit issuance. You will need to submit a written request to us no less than 60 and no more than 180 days before the term to complete expires. Requests received later than 60 days prior to the expiration date of the permit shall be eligible for consideration for extension, however a permittee who fails to make a timely request for an extension shall not engage in any activity requiring a coastal use permit past the original permit expiration date until an extension of the lapsed permit or a new permit is granted.

Is there a fee for an extension request?

Yes. A nonrefundable extension request fee in the amount of $80 shall be included with such a request, and the request must be received by the Permits & Mitigation Division no sooner than 180 days and no later than 60 days prior to the expiration of the permit in question. If the appropriate fees are not included along with the request for an extension to initiate a coastal use permit and/or to complete the use, the request will be considered incomplete, and returned to the permittee.

What do I need to do if my extension request involves modifications to a permitted activity?

Extension requests involving modifications to a permitted activity which would result in greater impacts to the environment than previously permitted will be considered as new applications rather than as extension requests. Extension requests involving modifications to a permitted activity which would result in identical or lesser impacts to the environment than previously permitted may be considered as extension requests, and must contain adequate information (such as drawings, maps, etc.) to support and explain the proposed modifications.

My permit expired last year and no extension was granted, what do I need to do to extend it?

You must submit a new application for any uncompleted work.

I have a letter from the Office of Coastal Management dated 3 years ago that says I don’t need a permit, but it also says that the determination is only valid for 2 years, what do I need to do?

You should submit a new application for any uncompleted work because there may have been changes to the law, impacted habitats, environment, etc. which may change the determination.

Can I transfer an expired permit?

Yes. Be aware that;

1) Expiration of a permit does not eliminate the need to comply with all permit conditions (especially as it relates to mitigation and the maintenance of mitigation)

2) Any additional work, maintenance, or completion of unfinished components will require a new permit.

How do I transfer a permit?

A permit transfer form and instructions are available on the internet here.

If you don’t have internet access please contact us at 1-800-267-4019, and we can send you a copy via mail.

BACK TO TOP

 

Wetlands Questions

What is a wetland?

Open water areas or areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and under normal circumstances, do support a prevalence of vegetation typically adapted for life in saturated soil conditions.

Does the Office of Coastal Management (OCM) use the U. S Army Corps of Engineers' (Corps) definition of wetlands?

No. The Corps determines their regulatory jurisdiction over wetlands under the authority of Section 404 of the Clean Water Act (CWA), as overseen by the Environmental Protection Agency (EPA). For such jurisdictional determinations, the Corps uses a three-parameter approach involving vegetation, soils, and hydrology. It is important to note that, under Section 404 of the CWA, the Corps regulates activities affecting wetlands throughout the United States, not just in coastal areas. In making wetland determinations, the Corps utilizes a regional approach; in coastal Louisiana, the Corps is guided by the document known as the "Supplement to the Wetlands Delineation Manual for the Atlantic and Gulf Coastal Plains."

OCM's coastal use permitting guidelines defines "wetlands" as: "open water areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, under normal circumstances, do support a prevalence of vegetation typically adapted for life in saturated soils."

In administering the Louisiana Coastal Resources Program (LCRP), OCM regulates certain activities within the state's defined coastal zone boundary; the LCRP was approved and is overseen by the National Oceanic and Atmospheric Administration (NOAA) under the authority of the federal Coastal Zone Management Act (CZMA) of 1972. The OCM, under authority of the CZMA and Louisiana's State and Local Coastal Resources Management Act (SLCRMA, La. R.S.49: 214.21 to 214.54), regulates activities that occur in wetlands as well as in other habitats when those activities would have a significant impact on the "coastal resources" and "coastal waters" of the state, including but not limited to beaches, dunes, barrier islands, cheniers, and salt domes.

Activities within the Louisiana Coastal Zone which are exempt from permitting include, but are not limited to, those found on most sites located above the 5-foot contour, those occurring in "fastlands" (i.e., areas enclosed by levees and drained by pumps), and those which require a Federal Consistency determination (e.g., ports and harbors, direct federal actions, projects on federally owned lands, etc.) Several unique landforms in coastal Louisiana, however, have been designated by Louisiana law and associated regulations as special features that may occur at elevations exceeding 5 feet but are considered "special" or "unique" geologically, and thus fall under the CZMA authority. In summary, those activities which would have direct and significant impacts on coastal resources are regulated under the LCRP, and those resources are not limited to coastal wetlands.

Examples:

  1. A common example of a wetland considered jurisdictional by OCM but not by the Corps is a bottomland hardwood site that occurs below the 5 ft. elevation but does not meet the hydric soils parameter for wetlands for Section 404 regulation purposes.
  2. A bottomland hardwood site located within a closed levee system with water levels within that system controlled by a forced-drainage pumping regime is considered by OCM to be in a "fastland" and thus exempt (i.e., not jurisdictional) under LCRP regulations. The Corps, however, may determine this site to be under the Corps' Section 404 regulatory jurisdiction because it meets the three-parameter approach to defining wetlands.
  3. A water company plans to install a 10-inch water line through a vegetated sand dune on a barrier island that is inhabited. A 404 USACE permit may not be required since the site does not meet two of the three parameters for defining wetlands; however, because dunes are designated in the LCRP as special areas and these features are considered to be a very important coastal resource, this activity will require a permit from OCM. Also, if unavoidable impacts to coastal resources were to occur as a result of this activity, OCM would likely require site restoration and/or compensatory mitigation for losses to coastal resources. (This example is provided to illustrate a habitat type that is not considered to be wetland by either the Corps or OCM, but is still considered to be an important habitat in the coastal zone and is, therefore, regulated by OCM.)

How do I get a wetland determination?

Wetland determinations/delineations are conducted by the U.S. Army Corps of Engineers. Please contact the U.S. Army Corps of Engineers to arrange for them to evaluate your property. You can visit the U.S. Army Corps of Engineers’ website to view more information about how to request a wetland determination at http://www.mvn.usace.army.mil/Missions/Regulatory/JurisdictionWetlands.aspx

If I have a wetland determination from the U.S. Army Corps of Engineers that says my property is not a wetland, do I need anything else?

Yes, activities within the Coastal Zone that are not exempt do require a permit. If your project is in the Coastal Zone, you need to submit an application to Office of Coastal Management and receive approval for your project before you commence work. While the Office of Coastal Management’s program is heavily weighted towards minimization of impacts to vegetated wetlands, other aspects of your project might also be regulated.

What will happen if my project does impact some wetlands on my property - do I have to pay some sort of fine?

First you will have to demonstrate that there is a need to impact the wetlands and that there are no feasible alternatives available (such as reducing the scope of your project or changing its configuration). If those hurdles are met, you will have to mitigate for any remaining impacts to vegetated wetlands.

In order to complete the mitigation requirements, you need to either develop an individual mitigation project or, in some cases, buy credits at an approved mitigation bank or area. Be aware that buying mitigation credits can be very expensive. For a number of reasons (ease of permitting, maintenance obligations, etc.), buying credits is usually the most feasible option if it’s an available to you.

BACK TO TOP

 

Wetland Mitigation

What is mitigation?

Mitigation includes the actions taken by the permittee to avoid, minimize, restore, and compensate for ecological values lost due to a permitted activity. (LAC, Title 43, Part I, Chapter 7, § 700).

What is compensatory mitigation?

Compensatory mitigation is the replacement, substitution, enhancement, or protection of ecological values to offset anticipated losses of ecological value caused by a permitted activity. The secretary will consider recommendations of state and federal agencies and parishes with approved local programs when selecting compensatory mitigation.

Why must I mitigate?

In cases where the applicant has exhausted all efforts to avoid and/or minimize adverse impacts to wetlands and other coastal resources and where the applicant has provided sufficient justification, OCM's goal of no net loss of wetland ecological value will be accomplished through compensatory mitigation for habitat loss. Compensatory mitigation is the "replacement, substitution, enhancement or protection of ecological values to offset anticipated losses of ecological values caused by a permitted activity" as defined under Title 43, Chapter 7, §700 of the Louisiana Administrative Code. Wetlands, beaches, barrier islands, reefs and other coastal resources serve a valuable function in the coastal environment and for the general public who utilize these resources. A permittee, whose activity diminishes these resources must provide replacement of those ecological values to an equal amount. These resources contribute benefits for fisheries, both commercial and recreational; storm surge reduction; water quality; wildlife and other recreational and commercial pursuits. Because these public benefits are so valuable, both the state and federal government have legislation requiring compensatory habitat mitigation.

What are my compensatory mitigation options?

  • Purchase credits from a mitigation bank/area that is approved by the Office of Coastal Management
  • Implementation of individual mitigation measure
  • Monetary contribution to the Louisiana Wetlands Conservation and Restoration Fund
  • Other options determined to be appropriate by the secretary which fully compensate for lost habitat values

 

When did the Office of Coastal Management begin requiring mitigation for unavoidable habitat impacts associated with Coastal Use Permits?

In 1980, at the inception of the state's coastal use permitting program, there were no statutes in force or rules that had been promulgated that required compensatory habitat mitigation, however the Louisiana Coastal Resources Program (LCRP) Final Environmental Impact Statement states, "The language of the (program) guidelines, while not requiring mitigation, clearly permits it". During the 1980s, projects with impacts to coastal resources were reviewed by a permit analyst, who worked with the applicant to provide some level of habitat improvement (mitigation) in an attempt to offset temporary and permanent habitat impacts. The analyst would evaluate the project site and the surrounding environs to determine if opportunities for mitigation existed by determining the availability of dredged material, evaluating the equipment that the permittee would have on site, and by relying upon experience and professional judgment. In this way analysts would successfully secure the construction of impact-offsetting habitat improvement work that could be performed during the implementation of the project.

In 1990, the Office of Coastal Management was directed by the Louisiana Legislature to require compensatory mitigation for unavoidable habitat impacts associated with Coastal Use Permits with the enactment of Acts 1040 of 1990, (R.S.49:214.41) and pursuant to this statute, the Rules and Procedures for Mitigation (LAC 43:I.724) were promulgated in August of 1995 to set in rule the procedure that was developed to implement this requirement. The state's coastal use permitting program must maintain a "no-net loss" of coastal wetlands due to permitted activities in order for the state to maintain the 85% / 15% cost-share agreement for Coastal Wetlands Planning Protection and Restoration Act (CWPPRA) program for coastal restoration projects.

What are the processing fees for mitigation activities?

Mitigation processing fees vary by the acreage of impacted vegetated wetlands and other coastal resources. The mitigation processing fees range from $50 (non-commercial activity, <1 acre impacted) to $15,000 (>100 acres impacted).

Please note that the actual costs for compensatory mitigation are not included in these processing fees. Please review the Mitigation section of the FAQs for additional information on compensatory mitigation.

How much will mitigation cost?

In the event that the OCM and permit applicant determine that the acquisition of credits from a mitigation bank is an acceptable measure to satisfy compensatory mitigation obligations of the permitted activity, the OCM will notify the applicant of which banks to contact and how many credits the applicant will be required to purchase from said banks. It is then the applicant’s responsibility to contact the bank to determine the unit cost of the credits.  The banks are private businesses that set their prices based upon market rates.

Should the mitigation option be a permittee responsible mitigation project, the costs to construct that project vary greatly depending on the location, project size, and habitat type to be created.

The amount of a monetary donation is based upon the cost to create that particular habitat that was impacted.  The amount is updated every two years.  Please contact the mitigation section to determine the current monetary cost.

How are mitigation obligations assessed?

Generally, mitigation obligations are not assessed on an acre for acre basis. Unavoidable net losses to wetlands are measured in Average Annual Habitat Units (AAHUs). An AAHU is defined as a unit of measure of ecological value. Wetland losses resulting from a project are quantified in AAHUs using the appropriate Wetland Value Assessment (WVA) model. The WVA uses site specific parameters in the calculation of the compensatory mitigation obligation. Ecologically “poor” sites will have fewer AAHUs per acre than ecologically “rich” sites which would yield higher AAHUs. Construction of an individual mitigation project or the purchase of credits from a mitigation bank, either of which that generates more AAHUs per acre than needed to replace the AAHUs impacted, may result in the need for fewer mitigation acres than were impacted and vice versa. Net gains in AAHUs resulting from a compensatory mitigation action must equal the AAHUs lost.

What are the location priorities when choosing a “permittee responsible mitigation plan”?

  • Mitigation must have positive impact on ecological value of the Louisiana Coastal Zone
  • Should be on-site if possible
  • Located on the affected landowner’s property (La. R.S. 49:214.41)
  • Located within the same hydrologic basin
  • In order of preference
  • Same habitat type
  • Produce similar ecological values to those impacted
  • Contribute to the overall wetland health of the hydrologic basin despite being in a different habitat type

How do I determine the appropriate mitigation site for my project?

The first place to start is to coordinate with the landowner. He may have habitat enhancement projects nearby which could be used. If not, the Local Coastal Program contact or his equivalent in parishes without approved local programs is a valuable source of information and assistance. In addition, both the Office of Coastal Management and the U.S. Army Corps of Engineers maintain databases of approved mitigation areas and mitigation banks from which credits can be purchased.

Note that it might not be possible to use a mitigation area or mitigation bank, depending on the type and location of the habitat impacted.

Do I need a permit for mitigation?

Yes. Public/interagency review of the mitigation project is required to ensure that it will not have unanticipated impacts on other coastal uses or coastal resources. We could do the notice prior to the issuance of a permit for the impacting activity and include the approved mitigation project as a component of that permit. Handling the mitigation as a separate permit; however, allows us to authorize the impact permit so the applicant can get started on his project while the details of the mitigation proposal are resolved.

What is the In-Lieu Fee and how is the amount determined?

The in-lieu fee is an agreement between the DENR and US Army Corps of Engineers that provides an option for mitigation of marsh impacts in the Coastal Zone by contribution of a monetary donation to the fund set up by DENR.  All monies in this fund are used by DENR to construct marsh habitat.  A donation to the in-lieu fee fund will satisfy mitigation obligations for both the DENR and Corps of Engineers, but is only available if purchase of credits from a mitigation bank is not an option.  The costs of credits is set by DENR at the actual cost to create marsh and updated every two years.

How does one establish an approved mitigation bank in the Coastal Zone?

A prospective mitigation bank sponsor is advised to consult with the Office of Coastal Management and the U.S. Army Corps of Engineers regarding their wish to establish a mitigation bank in the Coastal Zone prior to submitting formal documents. This consultation may consist of a telephone call and/or written correspondence briefly explaining the bank proposal and providing a location map. The prospective sponsor will prepare a mitigation bank prospectus to be submitted to Office of Coastal Management and the U.S. Army Corps of Engineers (Refer to 2008 USACE Rules: Compensatory Mitigation for Losses of Aquatic Resources; Final Rule, 40 CFR Part 230). The information provided in the prospectus will serve as the basis for establishing the mitigation banking instrument. The prospectus will be provided to the Interagency Review Team (IRT) co-chaired by the Office of Coastal Management and the U.S. Army Corps of Engineers. Based on the information provided in the prospectus, the site visit findings, and IRT discussions, the IRT may recommend modifications to the bank proposal. If the bank proposal is deemed acceptable, the sponsor and/or the IRT will develop a mitigation banking instrument for IRT approval and signature.

BACK TO TOP

 

Enforcement

If I start/complete a project without a permit, what will happen to me?

Processing of any permit application you have pending for the project will be suspended until the violation is resolved. You may be required to remove any structures installed and restore any impacted habitat. You may be subject to fines of up to $12,000 and may be put in jail for up to 6 months. And that’s just the state’s side; resolution of any section 404/10 violations with the U.S. Army Corps of Engineers can be significantly more expensive and more complicated.

How much does a violation cost?

Fines can range from $50 to $12,000. Normal permit processing and mitigation fees may also be applied. There may be additional fines applied by the U.S. Army Corps of Engineers due to any section 404/10 violations.

What happens if I violate permit conditions?

You may be required to remove any structures installed and restore any impacted habitat that exceeds the permitted scope of the project. You may be subject to fines of up to $12,000 and may be put in jail for up to 6 months. And that’s just the state’s side; resolution of any section 404/10 violations with the U.S. Army Corps of Engineers can be significantly more expensive and more complicated.

I’ve already done some clearing, did I break the law?

A representative from LDENR will perform a field investigation and project evaluation in order to determine the extent of any impacts and if you have violated any laws.

How do I report a possible violation?

Contact Robert Williamson of the Office of Coastal Management.

BACK TO TOP

 

Local Coastal Management Programs

What is a parish Local Coastal Management Program and under what authority are they established?

The State and Local Coastal Zone Management Act enacted by the Louisiana Legislature in 1995 clearly set forth that management of the State’s Coastal Resources was to be a joint effort of the State and affected Parishes’ governments. In fulfillment of this legislation the Louisiana Administrative Code sets forth provisions for the establishment and approval of Local Coastal Management Programs at Louisiana Administrative Code 43:I:725 et seq. Local Coastal Management Programs assist the state Louisiana Coastal Resources Program (LCRP) in managing the state’s coastal resources by taking over the regulation of “uses of local concern.”

What are the benefits to a parish of having a Local Coastal Management Program?

  1. A local coastal management program can serve as a centralized information nucleus, helping coordinate local implementation of the resource management programs of the many state and federal agencies.
  2. Through regular meetings of a parish coastal management advisory board, local coastal programs provide a forum for local folks who know the area best to speak out on what should be priority issues for local natural resource conservation, and to speak out on what local economic considerations should be appreciated and weighed in the balance as well.
  3. State and federal law says that there will be management and regulation of coastal resource use by some governmental body. Establishing a local coastal program asserts an increased level of local control over activities and uses that would typically be regarded as “uses of local concern”, but would fall to state oversight in the absence of a local coastal management program.
  4. Establishing a local coastal management program demonstrates that the parish is serious about taking an active role in participating in the decision-making that shapes coastal management policy in not only that parish, but for all of coastal Louisiana.
  5. Local coastal programs can help facilitate communications regarding access to funds for resource management.

How does a parish acquire an approved Local Coastal Management Program?

The provisions at Louisiana Administrative Code 43: I: 725 et seq. contain the procedures for adoption and approval of Local Coastal Management Programs. These procedures are explained in more detail on the How to Start an LCP page.

Even more details can be found in the regulations here.

What are the determining factors in issue of state vs. issue of local concern?

Louisiana Revised Statute 49214.25. Types of uses:

  1. Uses of the coastal zone subject to the coastal use permitting program shall be of two types:
  1. Uses of state concern: Those uses which directly and significantly affect coastal waters and which are in need of coastal management and which have impacts of greater than LOCAL significance or which significantly affect interests of regional, state, or national concern. Uses of state concern shall include, but not be limited to:

o    Any dredge or fill activity which intersects with more than one water body.

o    Projects involving use of state owned lands or water bottoms.

o    State publicly funded projects.

o    National interest projects.

o    Projects occurring in more than one parish.

o    All mineral activities, including exploration for, and production of, oil, gas, and other minerals, all dredge and fill uses associated therewith, and all other associated uses.

o    All pipelines for the gathering, transportation or transmission of oil, gas and other minerals.

o    Energy facility siting and development.

o    Uses of LOCAL concern which may significantly affect interests of regional, state or national concern.

  1. Uses of LOCAL concern: Those uses which directly and significantly affect coastal waters and are in need of coastal management but are not uses of state concern and which should be regulated primarily at the LOCAL level if the LOCAL government has an approved program. Uses of LOCAL concern shall include, but not be limited to:

o    Privately funded projects which are not uses of state concern.

o    Publicly funded projects which are not uses of state concern.

o    Maintenance of uses of LOCAL concern.

o    Jetties or breakwaters.

o    Dredge or fill projects not intersecting more than one water body.

o    Bulkheads.

o    Piers.

o    Camps and cattlewalks.

o    Maintenance dredging.

o    Private water control structures of less than $15,000 in cost.

o    Uses on cheniers, salt domes, or similar land forms.

  1. Subject to the provisions of this Subpart, the delineation of uses of state or LOCAL concern shall not be construed to prevent the state or LOCAL governments from otherwise regulating or issuing permits for either class of use pursuant to another law.

How do I determine if my application is an issue of "local concern”?

Simply follow the permit application procedures contained in The Application section of this FAQ and LDENR will determine if your application will be a use of state or local concern. If it is determined to be a local concern, the state will forward the application to the appropriate parish with an LCP. The parish will process the application.

What parishes have approved local coastal programs and when were the programs established?

The 12 parishes with approved local coastal programs and the date of their program document are as follows:

1987 Calcasieu

2000 Plaquemines

1983 Cameron

1982 St. Bernard

1982 Jefferson

1982 St. James

1982 Lafourche

1992 St. Tammany

1985 Orleans

2000 Terrebonne

2017 St. Charles

2018 St. John the Baptist

What do I do and who do I contact if my permit is deemed an issue of local concern?

Contact the applicable parish’s local coastal contact person from the information found on our website here.

Do parishes regulate oil and gas?

No. Parishes are expressly prohibited from regulating oil and gas through their approved local coastal programs. Many, however, have other parish ordinances by which they regulate certain aspects of the oil and gas business.

Why do parishes have advisory committees and what do they do?

Parish Local Coastal Programs may have advisory committees, but they are not required to. Parishes have advisory committees for numerous reasons including a method to obtain and to provide for citizen input to proposed activities which might impact their coastal zone, provide their elected officials with advice from their constituents on issues of concern relative to coastal matters, provide a venue for comment on activities that are uses of state concern, etc.

When do the Coastal Zone Advisory Committees meet?

Coastal Parish Advisory Committee Information is subject to change at the Parishes discretion. Please see question 8 and contact the Parish directly.

If I get assigned mitigation by the Local Coastal Management Program will this satisfy my mitigation requirements for the U.S. Army Corps of Engineers?

The state and the local Coastal Management Programs always try to coordinate mitigation requirements with the U.S. Army Corps of Engineers; however there could be instances where the requirements differ.

Is there state oversight of the parish Local Coastal Management Programs?

Yes, the regulations for the state oversight of the programs are contained at Louisiana Administrative Code 43: I: 725: F: 2: which can be found here.

Where can I go for more information on Local Coastal Management Programs?

Please click here.

BACK TO TOP

 

Federal Consistency

What is Consistency?

A Consistency review is to ensure that activities in the coastal zone are consistent with the Louisiana Coastal Resources Program (LCRP).  Activities in the coastal zone may require a Coastal Use Permit (which also serves as a consistency review).  Some types of coastal activities do not require a Coastal Use Permit, yet still must be consistent with the LCRP.  For example, Federal agencies are not required to obtain a CUP for their activities.  Other examples include deep-water ports and projects such as oil and gas exploration on Federal property.  Although not requiring a CUP, these activities still are required to be consistent with the State’s coastal management program.

The same standards and policies are used for both Consistency and CUP review.

Who should apply for Consistency review?

  • Federal agencies, whose activities (including new policies or regulations) may affect the land use, water use, or natural resources of the Coastal Zone
  • Private individuals or companies who must obtain a Federal license or permit, for activities on federal property (whether owned outright or controlled by the federal government), such as National Wildlife Refuges
  • Anyone whose activities are exempt from the Coastal Use Permits by State law (projects within fastlands or more than five feet above sea level, deep water ports, etc.), but whose activities may affect coastal resources
  • Oil and gas exploration and production,  ROW Pipelines, and certain other activities on the Outer Continental Shelf

Should I apply for a Coastal Use Permit or a Consistency review?

DENR staff can sort this question out for you. Telephone, e-mail, letter, or in-person consultation are all available, but the easiest method often is simply to submit the CUP application.

We’re not actually building anything. We’re simply developing a plan or enacting  new rules and regulations.

Whether or not any actual construction is proposed, if a Federal agency takes any action that may have reasonably foreseeable effects on coastal land use, water use, or natural resources, a consistency review is necessary. This includes indirect, secondary and cumulative impacts.

How do I go about submitting a consistency or determination?

We prefer that applications be submitted electronically by e-mail, or on CD or other electronic media if they are sent physically.  The online Joint Permit Application is a convenient option if a Corps of Engineers permit is needed; the JPA can be found at http://workflow.dnr.state.la.us/sundown/cart_prod/pkg_dnr_wf.initiate

For applicants for a Federal license or permit, simply send a copy of the permit application with a statement that you certify that the referenced project complies with and will be conducted in a manner consistent with the Louisiana Coastal Resources Program.  Also include, if not part of the Federal application, a detailed description of the proposed action, a large-scale location map, and plats and cross-sections of the proposed work.

For Federal agency activities, consistency determinations can be in any format. They must include a thorough description of the proposed activity and anticipated coastal impacts, a location map, plats and cross-sections of the proposed work.  For projects whose locations cannot easily be described by a few lat/long points, GIS shapefiles, in NAD 1983 State Plane Louisiana South Zone projection.  Finally, include the statement that you have determined that the proposed activity is consistent, to the maximum extent practicable, with the Louisiana Coastal Resources Program.

What are the fees for Consistency review?

There is a $300 fee for processing consistency applications. If a part of a project requires a Coastal Use Permit, the Consistency fee is reduced by the amount of the Permits fees. In addition, some activities are exempt from the Consistency fee, including:

  • Oil spill response
  • Activities performed for the management of State Wildlife Management areas and Refuges, National Wildlife Refuges, and State and National Parks

How long does it take to process an application for consistency determination?

We try very hard to complete each review as quickly as possible. The time of review depends on the type and complexity of the project and our overall workload. Most projects have a mandatory 15-day Public Comment Period, which begins within a week of receipt of the application. We usually complete our reviews well within our mandated deadlines, which are 60 to 75 days for Federal agency activities and three months for all other projects.

If I send my application for consistency to DENR, will I still need to coordinate with the Corps/other federal agencies?

Copies of Consistency applications are forwarded, with a request for comments, to the Corps of Engineers, US Fish and Wildlife Services, the Environmental Protection Agency, National Marine Fisheries, The Louisiana Department of Environmental Quality, the Louisiana Department of Wildlife and Fisheries, the Office of State Lands, and the local Parish coastal management office. These agencies should contact you directly if they require additional materials.

I don’t need a Corps permit. Do I need to send an application to OCM?

Perhaps. If you are a Federal agency and your activity may affect coastal land use, water use, or natural resources of the Louisiana coastal zone, a consistency determination may be required. If you’re not a Federal agency, but your activity may affect coastal resources, a consistency determination or Coastal Use Permit may be required.

What are the laws, rules and regulations governing Consistency?

Federal:

  • The Coastal Zone Management Act of 1972, as amended: 16 U.S.C.A. §§ 1451 to 1464
  • NOAA Regulations at 15 CFR 930

State:

  • The State and Local Coastal Resources Management Act of 1978, as amended: Louisiana Revised Statutes §§ 49:213.1 to 214.42
  • The Louisiana Administrative Code Title 43, §§ 700-729
  • Click here for more information.

My activity is not in the Coastal Zone, do I still need to send the application to DENR?

A proposed activity that is outside the Coastal Zone may still affect coastal resources. If coastal effects are reasonably foreseeable, a Consistency determination may be required even in cases where a Coastal Use Permit is not.

On occasion some other regulatory entity will require a written determination from our office even though we would not normally regulate the activity

I’m already doing NEPA compliance. Why do I need to do a consistency determination too?

NEPA and the CZMA are two different Acts, each with their own requirements. The two processes require much of the same information, so it may be convenient for you to provide your NEPA documentation as part of the consistency determination. There are, however, requirements unique to each law.

BACK TO TOP

 

Oil Spill Response and Natural Resource Damage Assessment

What to do in the event of a release?

If you see spilled oil, the law requires you to make two (toll-free) calls:
1) Call the 24-hour Louisiana Emergency Hazardous Materials Hotline at (877) 925-6595
2) Call the National Response Center at (800) 424-8802

What is the threshold of spilled oil to be reported?

Any amount of material spilled should be reported.

What is LDNR’s role in oil spills?

The Oil Spill Section is responsible for planning, response, and Natural Resource Damage Assessment (NRDA) activities resulting from oil spill incidents that occur in the Louisiana Coastal Zone. Primary duties of the Oil Spill Section staff is protecting natural resources during any significant unauthorized discharge of oil and NRDA to seek compensation for the public from the Responsible Party.  The Staff is also responsible for routine interagency coordination regarding oil spill events.

Does LDENR evaluate spills state wide?

LDNR’s Oil Spill section evaluates oil spills within the Louisiana Coastal Zone which is defined as coastal waters and adjacent shorelands which are strongly influenced by each other, and in proximity to the shorelines, and uses of which have direct and significant impact on coastal waters. On occasion, DENR will be asked to provide technical assistance outside of the Coastal Zone.  If a pipeline and/or any other oil producing structure(s) is involved with a spill the Oil Spill section will coordinate with DENR’s Office of Conservation.

What is NRDA?

The Natural Resource Damage Assessment is the process by which the Federal and State trustees follow to make the environment and public whole for injuries to natural resources and services resulting from an incident involving a discharge or substantial threat of a discharge of oil.