Department of Natural Resources | State of Louisiana
Department of Natural Resources
Atchafalaya Basin Bulletin

Greetings from DNR Secretary Scott Angelle and the Department of Natural Resources Atchafalaya Basin Program

New Look:
The Atchafalaya Basin Bulletin features a new look and interactive features.  Click Contact Us (at the top right) to send us a message or any questions you may have, or click the Facebook or twitter icons (bottom right) to check out DNR's social media presence.  You can forward your Basin Bulletin to a friend and encourage them to click the Subscribe link (bottom center) to receive regular Basin Updates.  We appreciate any feedback you might have on our new look and features.  On some email services, you may need to add this email address to a safe sender list, or click to approve the download of pictures.  Some features may not be available if viewing on a Blackberry or other smartphone.

Latest News:
WXTV-15: Louisiana casting for Swamp People on Friday
Daily World:  Search, recovery needs modernization

Upcoming Public Meetings:  
Several public meetings have been scheduled to receive and solicit Water Management Projects for inclusion in the FY2013 Atchafalaya Basin Annual Plan. An update on the FY2012 Atchafalaya Basin Plan will also be given.  Water Management Projects proposed for inclusion may be presented at Public Meetings on the following dates:

Tuesday, August 9, 2011 - 6:00 p.m.
St. Mary Parish
Morgan City Auditorium
728 Myrtle Street
Morgan City, Louisiana 70380

Wednesday, August 10, 2011 - 6:00 p.m.
Iberville Parish
Council Chambers
5850 Meriam Street
Plaquemine, Louisiana 70765

Wednesday, August 17, 2011 - 6:00 p.m.
St. Martin Parish
St. Martin Parish Council Chambers
301 West Port St.
St. Martinville, Louisiana 70582

New Water Project Nominations:
The New Water Project Nomination Form for water projects to be proposed for the FY2013 Annual Atchafalaya Basin Program Plan is now available at http://dnr.louisiana.gov/assets/OCM/ABP/ABP_PROJECTNOMINATIONFORM_REVISED_032411.pdf

Please return this form by mail to the address below, fax to (225) 342-6887, email to Atchafalaya@dnr.com or bring in person to an Atchafalaya Basin Water Management Project Nomination meeting.

Louisiana Department of Natural Resources
Atchafalaya Basin Program
P O Box 94396
Baton Rouge, LA 70804 

Atchafalaya Basin Natural Resource Inventory and Assessment System:  
The Atchafalaya Basin Natural Resource Inventory and Assessment System (ABNRIAS) is now available online at http://abp.cr.usgs.gov/   

FY2011-2012 Atchafalaya Basin Program Annual Plan:  
HCR 34 by Representative Karen St. Germain,  a concurrent resolution to approve the FY2011-2012 Atchafalaya Basin Program Annual Plan has been passed by both houses of the legislature. To view the Plan, go to DNR Facebook site and click the Basin line or go directly to Atchafalaya Basin Program site at www.basin.louisiana.gov.

Checking the water:
The information below is obtained from the USGS and the U.S. Army Corps of Engineers, and has been compiled by DNR into this format to allow a quick look at information pertinent to the Atchafalaya Basin.

 Data is for 8/4/2011

 ALL STAGE FORECASTS INCLUDE 24 HOURS OF FUTURE RAINFALL.

Mississippi River at Cairo
Location: Southern most gauge on the Ohio River in Illinois Reading significance - used to forecast rises on the Mississippi. Lag time, 4 to 6 days.
Flood Stage: 40'
Stage: 27.8'
Forecast:  expect to FALL to 27.5' by 8/08

Mississippi River, just south of ORCS, at Red River Landing
Reading:  Mississippi River south of ORCS, after the diversion into the Atchafalaya Flood Stage:  48'
Stage: 33.6'
Forecast: expect to FALL to 33.3' by 8/08 

Atchafalaya River, just south of ORCS, at Simmesport
Reading: The combined latitudinal flows of the Red, Black, Ouachita, and ORCS flow from the Mississippi
Flood Stage:  47'
Stage: 13.28'
Forecast: expect to RISE to 13.9' by 8/08

Atchafalaya River at Melville
Flood Stage:  41'
Stage: 9.16'
Forecast: expect to RISE to 9.6' by 8/08

Atchafalaya River at Krotz Springs
Flood Stage:  37'
Stage: 8.06'
Forecast: expect to RISE to 8.6' by 8/08

Atchafalaya River above Butte Larose
Flood Stage: 25'
Stage: 6.6'
Forecast: expect to RISE to 6.9' by 8/08

Atchafalaya River at Bayou Sorrell Locks on the GIWW Flood Stage: 12'
Flood Stage: 12'
Stage: 5.2'
Forecast: expect to HOLD at 5.2' by 8/08

Atchafalaya at Millet (Myette) Point
Flood Stage: 15'
Stage: 4.02'
Forecast: expect to RISE to 4.3' by 8/08

Atchafalaya River at Morgan City
Flood Stage: 4'
Stage: 3.05'
Forecast: expect to RISE to 3.1' by 8/08
NOTE: Gauge reading affected by ocean tides.

Murphy Lake near Bayou Sorrel
Stage:  10.66'

Lower Grand River at Bayou Sorrel
Stage:  5.66'

Bayou Courtableau
Stage: 18.39'

Buffalo Cove at Round Island
Stage: 5.69'

Arm of Grand Lake near Crook Chene
Stage: 7.74'

Middle Fork, Bayou Long
Stage: 4.18'

Pontoon Bridge at Butte Larose
Stage: 5.01'

Beau Bayou Swamp
Stage: 15.11'

Lake Pelba at I-10, Henderson
Stage: 9.75'

Instrumentation for real-time data collection at following sites have been removed in anticipation of water levels that could submerge and damage the equipment. During this time, we will continue to collect water level data using temporarily installed instrumentation that can withstand submersion, but cannot transmit in real-time. These devices will be collected after the water recedes, and the data captured during the flood event will be made available. Real-time data will resume after water levels have receded.

Bayou Darby at Fausse Pt. Cut

   
  Department of Natural Resources
617 North Third Street | LaSalle Building
Baton Rouge, LA 70802
(225) 342-0556
www.dnr.louisiana.gov
 
Like Us on Facebook
Follow Us on Twitter
 
       
PROFILE OPTIONS: Subscribe | Unsubscribe | Archives
-----------------------------------------------------------------------------------------------------
If you are having trouble viewing this message, please click here.